Green Infrastructure
The Council commissioned Land Use Consultants to prepare a Green Infrastructure Plan. This was published in August 2009 and is available below.
Part 2a Approach and open space (2,388KB) ![]()
Part 2b Access links (2,328KB) ![]()
Part 2c Landscape character (2,849KB) ![]()
Part 2d Cultural heritage (2,679KB) ![]()
Part 2e Ecology and biodiversity (5,111KB) ![]()
Part 2f Functional ecosystems and hydrology (926KB) ![]()
Part 2g Socio economic characteristics (9,496KB) ![]()
Part 3 Deficiency analysis (4,176KB) ![]()
Part 4 Green infrastructure hierarchy (6,454KB) ![]()
Part 5 Green infrastructure action plan (211KB) ![]()
Part 6 Greeninfrastructure principles (695KB) ![]()
Part 6c Letchworth Garden City (2,025KB) ![]()
Appendix 1 Planning and policy context (122KB) ![]()
Appendix 2 Methodology (106KB) ![]()
Appendix 3 Existing green infrastructure intiatives (69KB) ![]()
Appendix 4 NHDC open spaces (124KB) ![]()
Appendix 5 Stevenage open space quantity data (59KB) ![]()
Appendix 6 Summary of stakeholder consultation workshop responses (87KB) ![]()
Appendix 7 Initial green infrastructure proposals presented to stakeholder workshop (14,729B) ![]()
